to
Predictive modeling software for proactive network governance. Quantify and prove network needs in any scenario. Run precise analyses in hours and days instead of months or years in the field.
Outages and safety incidents are no surprise when you can only see a small fraction of your network at a time — and only see your assets and vegetation on their best behavior.
You’re trying to prioritize equipment maintenance, trim jobs, and capital projects —but you can only prioritize solutions to risks you can see.
You need to understand exactly how your assets will respond to severe weather —but field surveys only happen on fair weather days.
You need to prove your plan will actually solve reliability and resilience challenges —but measuring outcomes looks like guesswork.
A Primer on Digital Risk Mitigation
Answer any question with Neara | |
---|---|
If SE wind speeds exceed 70mph, which trees will be fall-in risks? | Complete vegetation work |
Which pole failures will cause the most outages in a storm? | Restore power |
Where will floodwaters recede fastest? | Remove of manual inspection time |
Where exactly would steel poles work best? | Defer |
Where are conductor clash risks close to major highways? | Identify clash risk |
What’s the optimal span length for a new line over hilly terrain? | Design new network |
Which assets are missing from my GIS? | Correct |
9x | 3x | 3x |
---|---|---|
Identify and resolve outage risks | Identify asset failure risks vs. other software | Restore power |
Network Health & Reliability | Digital Asset Management | Weather Resilience & Grid Hardening |
85% | 2x | 2x |
---|---|---|
Implement network design changes | Without building new infrastructure | Correct |
Network Design | Renewable Energy & Decarbonization | Digitization |
Power your network to a whole new level
Conduct cost-benefit analyses
in minutes, not months
Eliminate of field visits
Save of dollars annually
Talk to us to about how
While piloting Neara, we were able to simulate the impact of major flooding in late March. Rather than wait for digital inspections we eliminated 300 hours of inspection time and targeted our response to customers that needed assistance most.
- Scott Ryan, Chief Asset & Operating Officer, Endeavor Energy
CASE STUDY
By monitoring water and clearance levels daily, SA Power Networks was able to leave power on for longer for many customers as the floodwaters rose and also restore power more quickly as water receded. This innovative approach allowed for the re-energisation of power lines within five days, compared with the originally anticipated three-week timeframe using traditional manual methods.
- Doug Schmidt, General Manager, Network Management
CASE STUDY
We have found that the temperature our lines can operate at is much higher than we previously understood. Historically, we have had to apply a crude standard across the network. By modeling each span individually, we found that in many parts, the capacity is twice as high as we previously thought.
- John Cleland, CEO, Essential Energy
CASE STUDY
Visitors since 1/1/99:
Sign My Guestbook!
Under Construction!